BEAM — landing, Modernist
Drawing set — commercial construction Sheet 01 of 06 Rev 2026 {{ phone }}
01 · Mission Critical Utility Manufacturer

What's the real bottleneck in going vertical? Underground utility construction and coordination.

Ground-up commercial and industrial work, design-build and construction management — one accountable team from the first estimate to the final punch list.

Licensed & bonded OSHA 30 supervision Self-perform carpentry AGC member $10M general liability EMR 0.78
Sheet 01 — Model

What sits under an industrial site?

The network of duct banks, cabling and MV power lines that must be installed in the ground before anything goes vertical.

Fig. 1 — Campus utility model

Sheet 02 · Utility scope Rev 2026 · typical hyperscale campus · sample figures

The Problem

No. Measure Value Remark
01 Average underground utility package $45M Duct banks, MV feeders, water, sewer, telecom — per 100-acre campus
02 Site package as share of total build cost 8–12% Must be complete before vertical construction starts
03 Conduit installed, typical campus 1.2M LF PVC and HDPE duct bank, 2" to 8"
04 MV power cable pulled 380K LF 15 kV and 35 kV class feeders, substation to yard
05 Fiber and low-voltage cabling 2.4M LF Campus backbone, building entrances, meet-me rooms

Sample figures — replace with BEAM's project averages.

Sheet 03

What we build

Five lines of work, one supervision structure. Hover a line to see the work.

01

Ground-up commercial

Pad to certificate of occupancy — sitework, shell, envelope and finishes under one contract.

02

Industrial & warehouse

Slabs, dock work, racking and process space built to the tolerances your equipment needs.

03

Design-build

One contract for design and construction, so drawings and budget are reconciled as they are drawn.

04

Construction management

We run the trades, the schedule and the paperwork on your behalf — owner's interests, our supervision.

05

Preconstruction

Budgets, constructability review and long-lead procurement before the drawings lock.

Fig. {{ activeFig }} — {{ activeCaption }}

Sheet 04

How the job runs

STEP 01

Price it honestly

A line-item estimate with the assumptions written down. Allowances are named as allowances.

STEP 02

One number to call

The project manager who priced the work runs the work. Weekly look-aheads, photos from the field.

STEP 03

Build it once

Our own carpenters on the critical path, so the schedule does not depend on someone else's crew.

STEP 04

Close it out clean

Punch list walked with you, warranties and as-builts handed over, callbacks answered a year later.

Sheet 05 · On film Same crew, start to finish

Watch the work, not the words.

The film from the current site stays — set here as the page's one moving object, in a ruled frame with real controls.

Talk to a PM →
“They gave us a date in February and handed over the keys on that date.”
— Placeholder attribution · swap for a real client
Sheet 06 · Issue for bid

Send us the drawings.

Plans, a scope list or a napkin sketch — we will tell you within two business days whether we are the right builder for it.

Built right. On the date.

Request a bid →