Ground-up commercial and industrial work, design-build and construction management — one accountable team from the first estimate to the final punch list.
The network of duct banks, cabling and MV power lines that must be installed in the ground before anything goes vertical.
Fig. 1 — Campus utility model
| No. | Measure | Value | Remark |
|---|---|---|---|
| 01 | Average underground utility package | $45M | Duct banks, MV feeders, water, sewer, telecom — per 100-acre campus |
| 02 | Site package as share of total build cost | 8–12% | Must be complete before vertical construction starts |
| 03 | Conduit installed, typical campus | 1.2M LF | PVC and HDPE duct bank, 2" to 8" |
| 04 | MV power cable pulled | 380K LF | 15 kV and 35 kV class feeders, substation to yard |
| 05 | Fiber and low-voltage cabling | 2.4M LF | Campus backbone, building entrances, meet-me rooms |
Sample figures — replace with BEAM's project averages.
Five lines of work, one supervision structure. Hover a line to see the work.
Pad to certificate of occupancy — sitework, shell, envelope and finishes under one contract.
Slabs, dock work, racking and process space built to the tolerances your equipment needs.
One contract for design and construction, so drawings and budget are reconciled as they are drawn.
We run the trades, the schedule and the paperwork on your behalf — owner's interests, our supervision.
Budgets, constructability review and long-lead procurement before the drawings lock.
Fig. {{ activeFig }} — {{ activeCaption }}
A line-item estimate with the assumptions written down. Allowances are named as allowances.
The project manager who priced the work runs the work. Weekly look-aheads, photos from the field.
Our own carpenters on the critical path, so the schedule does not depend on someone else's crew.
Punch list walked with you, warranties and as-builts handed over, callbacks answered a year later.
The film from the current site stays — set here as the page's one moving object, in a ruled frame with real controls.
“They gave us a date in February and handed over the keys on that date.”
Plans, a scope list or a napkin sketch — we will tell you within two business days whether we are the right builder for it.